IBM InfoSphere DataStage v8.5 認定 000-421 試験問題:
1. A customer requires reading a fixed-length sequential file in parallel where input rows can be identified. What two tasks must be done to meet these requirements? (Choose two.)
A) Set partitioning method to Same.
B) Ensure data has unique identifiers for data rows.
C) Set $APT_READ_MULTI_NODES to TRUE.
D) Specify Multiple readers per node.
2. Which three attributes are found for each segment in a Data Set descriptor file? (Select three)
A) Path names of all data files on all processing nodes.
B) Statistical information such as number of records in the segment and number of bytes.
C) Flag marking segment as valid or invalid.
D) Copy of the configuration file used when segment was created.
E) Schema of Data Set.
3. You found there were common functional requirements in the data mapping specification. The required functions are same but the record formats are different. Which action will allow you to effectively implement common logic?
A) Create parallel shared containers and define columns combining all data formats.
B) Create parallel routines.
C) Create separate jobs and choose appropriate job within a job sequence.
D) Create parallel shared containers with Runtime Column Propagation (RCP) ON and define only necessary columns needed for the logic.
4. How are Shared Table definitions created from the DataStage Client?
A) Using the "Save" button on the columns tab on the Stage/Link editor
B) No need to, DataStage table definitions are automatically saved as shared metadata.
C) Using the "Save" button on the "Table Properties" panel
D) Using the "Shared Table Creation Wizard" from the DataStage Client.
E) This cannot be done from the DataStage Client
5. A job is using the Load method in the DB2 and Oracle Enterprise stage for parallel loading into a single table. The job fails at runtime and you see there are new table rows added. What would explain this result? (Select two)
A) Some partitions completed before failure.
B) Commit size is smaller than source data.
C) Load operations are parallel.
D) Load operations are sequential.
質問と回答:
| 質問 # 1 正解: B、D | 質問 # 2 正解: A、B、D | 質問 # 3 正解: D | 質問 # 4 正解: D | 質問 # 5 正解: B、C |














0 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。
