Microsoft Recertification for MCSD: Application Lifecycle Management 認定 70-499 試験問題:
1. Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your development team uses Visual Studio 2012.
You store specialized design files within your Visual Studio solution by using version control. These design files are stored in a proprietary binary format and use the filename extension .dzn.
You need to meet the following requirements:
Ensure that all developers can modify these design files.
Prevent multiple check-outs on all .dzn files.
Ensure that all other file types can be edited by multiple developers at the same
time.
What should you do?
A) Within the Visual Studio Options dialog box for Source Control, add the .dzn extension to the Prevent multiple check-outs for the following file types list in the Visual Studio Team Foundation server node.
B) Add a new file type for .dzn to the Team Project Source Control Settings and clear the Enable file merging and multiple check out checkbox.
C) Within the Source Control Explorer, right-click each .dzn file and uncheck the Allow
---
multiple check outs option.
D) Add a new file type for .dzn to the Team Project Collection Source Control Settings and clear the Enable file merging and multiple check out checkbox.
2. You create a layered web application. The service layer includes a suite of nUnit tests for the code. The web application contains JavaScript and has no tests.
You configure a build agent running as a service and create an automated build.
You need to include unit testing in the development and automated build of the application. You need to achieve this goal with the least amount of impact to the development team.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A) Convert all the nUnit tests for the business logic layer into MSTests.
B) Create QUnit tests to test the Javascript in the web application.
C) Use Coded UI Tests to test the JavaScript in the web application.
D) Configure the build to use the existing nUnit tests.
3. DRAG DROP
You are the administrator of a Microsoft Visual Studio Team Foundation Server (TFS) installation.
You are configuring a version control proxy server at a remote site.
You need to configure the proxy to cache all collections on MAINCODE and only the CommonLib collection on AUXCODE. You open the proxy's Proxy.config file.
Which code segments should you include? To answer, drag the appropriate code segments to the correct cache location. Each code segment may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
4. You are the lead software developer for your company. You are using Microsoft Visual
Studio 2012 and Test Driven Development to create a new commercial software product.
Management asks you to define unit testing standards that all developers will follow.
You need to design the first unit test for a new class.
What should you design the first unit test to do initially?
A) test a range of values
B) test exceptional cases
C) fail the base case
D) pass the base case
5. You manage a development team for a group of stakeholders that are physically remote from your development center. Stakeholders have blocked out dates and times on their schedules for your team.
The stakeholders are concerned that several of the project requirements will not meet their needs due to changing market conditions.
You need to ensure that the following requirements are met: s
Your team is doing effective and efficient work.
The work is meeting the needs of the business.
The project's timeline is not at risk.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
---
A) Develop a series of iterative proofs of concept that reflect a partial delivery of requirements and get feedback from the product owner.
B) Add a primary stakeholder to your team as the product owner.
C) Institute a policy of sign-offs for each requirement and design document.
D) Instruct the team to create a comprehensive set of design documents for each layer of the system. Schedule a review with the stakeholders to get their feedback.
質問と回答:
| 質問 # 1 正解: D | 質問 # 2 正解: B、D | 質問 # 3 正解: メンバーにのみ表示されます | 質問 # 4 正解: C | 質問 # 5 正解: A、B |














1215 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。