CMAA Certified Construction Manager (CCM) 認定 Construction-Manager 試験問題:
1. Who owns the float in a typical project critical path schedule?
A) Contractor
B) Owner
C) Project
D) Construction manager
2. The contract documents normally require which party/parties to coordinate the transfer of spare parts and warranties to the owner?
A) Regulatory agencies
B) CM
C) Designer
D) CxA
3. Float, date, and duration are examples of
A) logic elements.
B) schedule elements.
C) constraints.
D) schedule parameters.
4. Which of the following would MOST likely help provide benchmarking for a sustainable project?
A) Energy Star program
B) Department of Transportation
C) Housing and Urban Development
D) Environmental Protection Agency
5. When the CM assists the owner in prequalifying, evaluating, or screening potential contractors, especially as it relates to safety programs, the CM should evaluate the contractor's lost time frequency rate; lost time severity average; OSHA 200; OSHA 300; experience modification rate; and an up-to-date list of any OSHA citations issued to them in the last three years, including the disposition of each citation. This is important because:
A) a contractor with a poor safety record may increase the owner's risk and worker compensation costs.
B) a contractor with a poor safety record is likely to be a low bidder.
C) extensive documentation is required to demonstrate sufficient due diligence.
D) contractors only monitor safety if they understand the owner's emphasis on safety.
質問と回答:
| 質問 # 1 正解: C | 質問 # 2 正解: B | 質問 # 3 正解: D | 質問 # 4 正解: A | 質問 # 5 正解: A |














1221 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。
