SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade 認定 E-S4CON-2025 試験問題:
1. What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
A) It explains where to find infformation about the custom code analysis.
B) It is a operating system-speecific document.
C) It contains a section about the simplification item (SI) checks.
D) It explains the database migration option (DMO) of SUM.
2. You are performing an inplace SAP S/4HANA conversion including DMO.
What is the latest point in time wheen you can reset the procedure without losing businness data?
A) The end of the database miigration
B) The start of the business doowntime
C) The end of the business downtime
D) The start of the Execution roadmap step
3. You are running an SAP ECC system .
For which of the following activitiess does SUM allow you to use the near-Zero Downtimme Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.
A) Apply SAP Support Packagees.
B) Use DMO for SUM.
C) Perform an SAP S/4HANA conversion including DMO.
D) Upgrade the SAP system.
E) Perform an SAP S/4HANA conversion without DMO.
4. You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
A) SUM is still running in uptimme; the 40 defined R3load processes are considered.
B) These are 40 pairs of R3load processes, so there are 80 R3load processes running
C) Without table contents commparison, only 40 R3load processes are being started.
D) There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.
5. You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For soome software components, you find entries in the Calculated level column.
What does the Calculated level indiicate for those software components?
A) The SAP Support Packages that will be bound to the conversion
B) The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner
C) The SAP Support Packages in the download directory that are newer than the selected Support Package stack
D) The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
質問と回答:
| 質問 # 1 正解: A、C | 質問 # 2 正解: C | 質問 # 3 正解: A、B、D | 質問 # 4 正解: B | 質問 # 5 正解: C |














1611 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。