HP Servicing HP BladeSystem Solutions 認定 HP2-T26 試験問題:
1. After replacement of a BL460c G7 system board, the server is unable to connect to an external shared storage through the SAS interface. Other similar servers in the same enclosure are in working condition.
What should you check to verify that the physical hardware connectivity is connected?
A) ACU of the server blade for storage status
B) external storage power status
C) blade server port mapping for the IO module connectivity to the interconnect module
D) blade server iLO for hardware information detected by the management processor
2. Your customer uses a c3000 enclosure with only one Virtual Connect Flex 10 module in bay 1. The Virtual Connect firmware needs to be updated and you are in the process of writing an action plan for this process. Which information needs to be included in this action plan?
A) Virtual Connect Troubleshooting Guide
B) information for possible elevation
C) download location of the firmware
D) Statement of Work
3. A customer has a c7000 enclosure that is fully populated with BL680c blades. Two months after the initial installation, the rack initiates a thermal shutdown. When diagnosing the problem, you find there is not enough space to get behind the unit. You pull all the units out but find no problems with the chassis, blades, or their cooling systems.
What is a potential cause for the thermal shutdown?
A) There is insufficient air circulation causing hot air from the rear of rack to be fed back to the equipment through the front of the rack.
B) The blade enclosure's fan system is not strong enough to remove the thermal heat generated in a fully populated enclosure.
C) The rack is too close to the cold air outlet. The hot air area is too large, and the cooling system is unable to recirculate the hot air effectively.
D) The cooling system temperature in the data center is set too low This results in the enclosure cooling fan system rotating at a lower RPM and not removing enough of the thermal heat.
4. A customer is experiencing intermittent storage connectivity issues in their BladeSystem environment. After collecting the log files from the external storage system and the interconnects, you suspect the problem is in the Onboard Administrator configuration.
Which step should you take next in the troubleshooting process?
A) Develop an optimized action plan.
B) Run the First Time Setup Wizard.
C) Reset the Onboard Administrator to factory defaults.
D) Escalate the problem.
5. How can a ProLiant server running Linux be rebooted from a remote location?
A) clicking on Start and then clicking on Shut Down in the remote iLO console screen
B) using the command init 6 in the remote iLO console screen
C) using the command shutdown now -h in the remote iLO console screen
D) using the virtual power off button of the iLO
質問と回答:
| 質問 # 1 正解: C | 質問 # 2 正解: A | 質問 # 3 正解: A | 質問 # 4 正解: A | 質問 # 5 正解: A |














832 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。